so today there was some big chemical spill in the industrial estate that i work in so everyone got evacuated at like 7:30am and im on night shift so my boss called me in the arvo and was like dont worry about coming into work the roads are still closed. So i didnt worry about it and then at like 4:30 my boss rings me again and told me that the roads are open and i have to go to work when my start time is 4:00 so rocked up to work and was told we have to make up for day shift not doing anything so had to work 14hrs. Is it just me or is that a load of bullshit ?