Well, we are remodeling the shop again.
Today we started everything we need for an isolated clean room, ( to clean all of our tubes, clamps, openers, closers, and what nots)
It was basically me by myself doing it today, but thats only really because there isn't enough room for another person to help me)
Lunchbox did drive the boss home and come back to help me for 2 hours as I staid late because I was on a role.
Today I got the new outlet, switch and light in.
I also put in the new hot and cold supply lines. This took far longer than expected because I could not get into the wall to work on the pipes and I did not want to remove the drywall and FRP.
I started the day bybuilding the frame for the cabinet and countertop and cut the counter top and installed the sink basin.
I ended the day by dry mocking all of the lines for the sink, control and sprayer as well as the drain lines.
Man I'm tired, but I think I just turned a 4 or 5 day project into a 2 1/2 day project.
Today we started everything we need for an isolated clean room, ( to clean all of our tubes, clamps, openers, closers, and what nots)
It was basically me by myself doing it today, but thats only really because there isn't enough room for another person to help me)
Lunchbox did drive the boss home and come back to help me for 2 hours as I staid late because I was on a role.
Today I got the new outlet, switch and light in.
I also put in the new hot and cold supply lines. This took far longer than expected because I could not get into the wall to work on the pipes and I did not want to remove the drywall and FRP.
I started the day bybuilding the frame for the cabinet and countertop and cut the counter top and installed the sink basin.
I ended the day by dry mocking all of the lines for the sink, control and sprayer as well as the drain lines.
Man I'm tired, but I think I just turned a 4 or 5 day project into a 2 1/2 day project.
VIEW 6 of 6 COMMENTS
It seems like everyone is doing something productive.
Everyone except me. Blah.