We are headed home tomorrow.
Over the last 10 days I have brought two bathrooms from asbestos abatement/demolition to bare studs and joists then right back to new floors, walls, electrical, plumbing, and sewer. The only things missing are tile and paint.
I'm tired.
Over the last 10 days I have brought two bathrooms from asbestos abatement/demolition to bare studs and joists then right back to new floors, walls, electrical, plumbing, and sewer. The only things missing are tile and paint.
I'm tired.
VIEW 9 of 9 COMMENTS
taye:
Thanks for being a fine babysitter so your wife could come and show off for us! She rocked my socks off. 

taye:
I could totally picture that. haha